1 Comment

Hi Naveen, interesting video on RMF. I would like to ask you, suppose we use PHA (not in the sense that it is preliminary, we use it as a product hazard analysis for the lifecycle), we do include all types of hazards based on usibility, foreseeable misuse and failures. Can this be considered as a complete risk assessment? If yes, does this PHA document (matrix) be considered as the Risk Trace Matrix too ? I am confused how the RIsk Trace Matrix is different from the tools that we use for assessment(which also happent ot be a similar matrix table). Thanks in advance.

Expand full comment